More and more residents want to charge their car in their garage space. The good news: it is possible in most buildings and the process with the community is straightforward. The key is choosing how the charger is connected.

1. Notify the community

To install an individual charging point in your own space, regulations generally do not require approval at a residents’ meeting: you simply notify the president or property manager in writing, in advance, and cover the cost.

We recommend attaching a short technical report describing the cable route and the charger, so the community knows where the cable will run. We prepare it for you.

2. Choose how it connects

This is the most important decision. The usual options:

  • From your own home meter (most common). A new line runs from your meter in the meter room to your space. Consumption goes on your bill and affects no one else.
  • With a dedicated meter for the space. An independent supply just for the car. Useful for a different tariff, but more paperwork.
  • From a shared pre-installation. If the building already has charging infrastructure, the charger connects to it with an individual sub-meter.

The distance from the meter to your space, room in existing trays or conduits and available power determine which option suits. We assess it on a visit.

3. Choose the charger power

Charger Power Approximate range per hour of charging
Single-phase 16 A 3.7 kW 20 – 25 km
Single-phase 32 A 7.4 kW 40 – 50 km
Three-phase 16 A 11 kW 60 – 70 km

For most people, 7.4 kW is plenty: one night recharges far more than daily use.

What if your contracted power is tight? Two options: increase your power or install a load manager, which reduces charging when the house is using a lot.

4. Installation and certificate

The installation includes the dedicated line, protection (breaker and RCD suitable for EV charging), the charger and its set-up. On completion, the installation certificate is issued and registered like any other electrical installation.

How much does it cost?

It mainly depends on the distance between your meter and your space and the charger chosen. As a guide:

  • Quality home charger: €500 – €1,000.
  • Installation from your meter, short or medium run: €600 – €1,500.
  • Long runs, civil works or a new meter: custom quote.

Indicative prices excluding VAT. Also check the grants and tax deductions currently available for charging points: they change every year and can reduce the cost significantly. We advise you when quoting.

Tips

  • Schedule charging for off-peak hours, when electricity is cheapest.
  • Choose a connected charger to control charging and consumption from your phone.
  • If several residents are interested, a shared pre-installation can lower the cost for everyone.

COMA Electrics installs charging points in homes, shared garages and businesses across Catalonia, including the technical report for your community and the certificate. See our EV charger service or get a quote.

Frequently asked questions

Can the residents’ community refuse my charger?

For an individual charging point in your own space, notifying the community in advance and paying the cost is generally enough. If your building has particular circumstances, your property manager will confirm the procedure.

Who pays for the charger’s electricity?

If the charger is connected to your own meter, the consumption goes on your home bill. This is the most common option and avoids disputes.

What charger power do I need?

For most drivers, a 7.4 kW charger is enough to recharge overnight. If your contracted power is tight, it can be limited or combined with a load manager.